Dell m bac del5 mouse drivers for mac. Oracle's Primavera P6 Enterprise Project Portfolio Management—Resources. Powerful Tools for Global Project Planning. Manage projects of any size with this cloud-based, robust, and easy-to-use solution for globally prioritizing, planning, managing, and executing projects, programs, and portfolios. Request the demo. Data sheet (PDF).

Oracle has just released Primavera P6 18.8 and here’s a look at what’s new in Primavera P6 Professional version 18.8:. Performance Percent Complete Field Based On Labor Units.The Performance% Complete – Labor Units field shows the percentage of the activity or project planned work that is currently complete as measured by labor units.Calculated as Earned Value Labor Units divided by Budget at Complete Labor Units multiplied by 100.

Always in the range 0 to 100.Earned Value Labor Units: The portion of baseline labor units that are complete as of the project data date.Activity Level:Calculated as BL Project Labor Units or BL1 Labor Units, depending on project settings, multiplied by Performance% Complete.WBS Level:Calculated as BL Project Labor Units multiplied by Performance% Complete. Upload Graphics to the P6 Database to View and Print From Any Location.You can upload graphics for use in reports directly to the database. This allows you to view and print graphics even when the graphic was added from a different computer. 32-bit Operating Systems Not Supported.32-bit operating systems are no longer supported. We recommend using 64-bit operating systems instead.The SDK (Software Developers Kit) is a 32-bit technology and is no longer supported. We recommend using the API (Application Programmers Interface) instead.

Import Zipped XER Files.You can import XER files directly from a zipped file, without the need to decompress the file manually before importing. Activity Owner Functionality Improvements.You can import the Owner field from Primavera XML files if the destination database includes the same users as the originating database.About Activity OwnersUsers in P6 can be designated as activity owners. An activity owner who has Projects module access and the required privileges can update the status and other details for their assigned activities.When adding an activity to a project, the activity can be assigned an activity owner or a resource assignment.Activity owners are typically used when resource assignments are not used for reporting status on activities, or when one person is responsible for reporting for a team or a crew. For example, a construction foreman is assigned as an activity owner and is responsible for reporting status on the progress for the entire crew.This feature can be used in combination with Reflection projects in P6 Professional to enable controlled merging of contractor schedules with activity owner schedules.Activity Owners can report status on activities in P6 or in P6 Team Member interfaces. If status is reported in P6 Team Member interfaces, project managers can turn on Team Member status reviews and review, update, and approve the activity updates in P6.

Choose Whether to Update Actual and Budgeted Units and Costs When Updating Baselines with New Assignments.The Activity Data tab of the Update Baseline dialog box allows you to choose whether to update actual or budgeted units and costs when adding new resource and role assignments to the baseline.